Control Flow Stops

  • Hi

    I have a package with several tasks (10). I have a precedence constraint set between 2 tasks (between no.5 and no.6) that is set to constraint (true) and expression. Both must evaluate too true to move to the next task. This works fine but when the control flow completes task no.6 it stops and doesn't continue to the remaining tasks (no's 7-10).

    Any ideas would be appreciated.

  • Duplicate post. No replies to this thread please. Direct replies to:http://qa.sqlservercentral.com/Forums/Topic662376-148-1.aspx

    Gail Shaw
    Microsoft Certified Master: SQL Server, MVP, M.Sc (Comp Sci)
    SQL In The Wild: Discussions on DB performance with occasional diversions into recoverability

    We walk in the dark places no others will enter
    We stand on the bridge and no one may pass

Viewing 2 posts - 1 through 1 (of 1 total)

You must be logged in to reply to this topic. Login to reply