suppose the currnet drive of backup is removed and assigned with same drive letter is the scheduled backup in the drive executes???

  • HI,

    1.suppose the currnet drive of backup is (N:Drive 100 Gb ) removed from cluster and

    2.assigned with same drive letter (N:Drive 200 Gb ) cluster

    3. is the scheduled backup in the drive executes??? in the drive which is added now (N:Drive 200 Gb ) in the place of previous (N:Drive 100 Gb)

    4. is it required to reconfigure the Backup maintenance plans ?

    Thanks
    Naga.Rohitkumar

  • Duplicate post. No replies to this thread please. Direct replies to:http://qa.sqlservercentral.com/Forums/Topic1352718-357-1.aspx

    Gail Shaw
    Microsoft Certified Master: SQL Server, MVP, M.Sc (Comp Sci)
    SQL In The Wild: Discussions on DB performance with occasional diversions into recoverability

    We walk in the dark places no others will enter
    We stand on the bridge and no one may pass

Viewing 2 posts - 1 through 1 (of 1 total)

You must be logged in to reply to this topic. Login to reply