Jeff Moden

  • Interests: SQL. When Im not having fun with that, then SQL. ;-)

SQLServerCentral Article

Calculating Work Days

How many times have you wished that there was a parameter for DATEPART to allow you to check for workdays? While many of us may get stuck working 6 or 7 days a week, most of the world revolves on a 5 day work week. Monday through Friday. New author Jeff Moden brings us a method of easily calculating the number of workdays between any two dates.

4.89 (38)

You rated this post out of 5. Change rating

2007-10-02 (first published: )

62,649 reads

Technical Article

Difference between dates with thousands separators

This function calculates the time difference between 2 datetimes and displays the results in the following format:H,HHH,HHH:MM:SSThe return is a 15 character field that is left padded with spaces so that the field becomes right justified.  This makes the colons line up for easy reading.  Commas are automatically added as thousands separators as needed by […]

3 (2)

You rated this post out of 5. Change rating

2004-03-14

400 reads

Blogs

Set a Runtime Variable in an Azure DevOps Pipeline

By

Note: I DO NOT recommend this. Any changes to a pipeline should be in...

A New Word: Symptomania

By

symptomania – n. the fantasy that there’s some elaborate diagnosis out there that neatly...

Query Store Keeps Switching Itself Off, Getting it Moving Again

By

I recently received a complaint that Query Store for a particular database was turned...

Read the latest Blogs

Forums

7 sept, scheduled book

By philip.scott

Comments posted to this topic are about the item 7 sept, scheduled book

7 sept, schedlued article

By philip.scott

Comments posted to this topic are about the item 7 sept, schedlued article

6 sept, published book

By philip.scott

Comments posted to this topic are about the item 6 sept, published book

Visit the forum

Question of the Day

Azure Data Lake Storage Gen 2

Azure Data Lake Storage Gen 2 is built on ...?

See possible answers