October 26, 2011 at 4:52 pm
Hi,
I've a job that is scheduled to run weekly on Mon-Fri every 3 hours starting 8 AM and end 7 AM. However job history shows that the job runs only twice on Tue, Thu and SAT?? at 2 AM and 5 AM.
It runs as expected at 8 AM, 11 AM, 2 PM, 5 PM, 8 PM, 11 PM on Mon, Wed and Fri. Anyone had similar issues?
October 27, 2011 at 1:25 am
How have you configured the schedule?
You cannot have schedules which span days.
Also, if you want 8am – 7am your schedule will begin at 8am Monday and finish at 7am Tuesday thus giving you a 23 hour window and a 2am and 5am execution. Do you actually want it to start in the morning and finish in the afternoon?
October 27, 2011 at 5:27 am
MysteryJimbo (10/27/2011)
How have you configured the schedule?You cannot have schedules which span days.
Also, if you want 8am – 7am your schedule will begin at 8am Monday and finish at 7am Tuesday thus giving you a 23 hour window and a 2am and 5am execution. Do you actually want it to start in the morning and finish in the afternoon?
It's configured Weekly, Mon-Fri, begin 8 AM, end 7 AM, run every 3 hours. Not sure why you cannot have schedule which spans days, since the option is there. The goal is to configure a schedule to run every 3 hours during working week.
Still don't get why this would run on a Saturday but not Sunday, both days are checked off.
October 27, 2011 at 5:47 am
Lexa (10/27/2011)
It's configured Weekly, Mon-Fri, begin 8 AM, end 7 AM, run every 3 hours. Not sure why you cannot have schedule which spans days, since the option is there. The goal is to configure a schedule to run every 3 hours during working week.Still don't get why this would run on a Saturday but not Sunday, both days are checked off.
Sorry, I got my Windows scheduler confused with the sql agent. I've never had this in type of schedule in SQL.
To get a schedule to run 00:00 Mon- 23:59:59 Friday, you need to enable the times to run 00:00 - 23:59:59, running every 3 hours
This will give you a start time of 00:00 Monday am and it will run every 3 hours until 21:00 Friday. If you want it to run at 00:00 Satuday you will need to change the times to 00:00 - 00:00:00
It ran on Saturday because your Friday schedule was 8am Friday - 7am Saturday. The two executions on Saturday were part of fridays schedule. Saturdays, had you ticked the box, would have begain at 8am.
October 27, 2011 at 7:20 am
MysteryJimbo (10/27/2011)
Lexa (10/27/2011)
It's configured Weekly, Mon-Fri, begin 8 AM, end 7 AM, run every 3 hours. Not sure why you cannot have schedule which spans days, since the option is there. The goal is to configure a schedule to run every 3 hours during working week.Still don't get why this would run on a Saturday but not Sunday, both days are checked off.
Sorry, I got my Windows scheduler confused with the sql agent. I've never had this in type of schedule in SQL.
To get a schedule to run 00:00 Mon- 23:59:59 Friday, you need to enable the times to run 00:00 - 23:59:59, running every 3 hours
This will give you a start time of 00:00 Monday am and it will run every 3 hours until 21:00 Friday. If you want it to run at 00:00 Satuday you will need to change the times to 00:00 - 00:00:00
It ran on Saturday because your Friday schedule was 8am Friday - 7am Saturday. The two executions on Saturday were part of fridays schedule. Saturdays, had you ticked the box, would have begain at 8am.
Thanks MysteryJimbo, that makes sense.
October 27, 2011 at 7:26 am
Lexa (10/27/2011)
Thanks MysteryJimbo, that makes sense.
No problem! 😀